stlracing: Tcs mod feature: long leading the way gets into find 1 wall hard on final lap after conta

jdearing

Administrator
Staff member
stlracing: Tcs mod feature: long leading the way gets into find 1 wall hard on final lap after contact with a lapped car. Mevert takes over the lead
 
stlracing: Tcs mod feature: long leading the way gets into find 1 wall hard on final lap after contact with a lapped car. Mevert takes over the lead
What a ood night of racing, yeah ****ed for long, same thing happen to mavert last week. The only difference is mavert left the track with class.
 




Back
Top