Follow along with the video below to see how to install our site as a web app on your home screen.
Note: this_feature_currently_requires_accessing_site_using_safari
got a few more just slow uploading kinda sad to see the ole half mile being torn up
So, what exactly are they doing. Removing the 1/4 and 1/2 or just the 1/2?
Kevin said work on the new medium-banked 3/8 mile track would begin on Monday to allow the new configuration maximum time to cure over the wintertime. Since the infrastructure is already in place, it will utilize the current bleacher set-up, so it will still run east-west. There are plans to put a wall all the way around the track, which would allow for more bleachers to be erected along the backstretch, as well as the construction of corporate suites.
As far as classes for the new Friday night show, there are meetings scheduled to determine the direction they will be taking in 2007. Kevin said to be watching for a big announcement November 1st.
_________________
Kevin said work on the new medium-banked 3/8 mile track would begin on Monday to allow the new configuration maximum time to cure over the wintertime. Since the infrastructure is already in place, it will utilize the current bleacher set-up, so it will still run east-west. There are plans to put a wall all the way around the track, which would allow for more bleachers to be erected along the backstretch, as well as the construction of corporate suites.
As far as classes for the new Friday night show, there are meetings scheduled to determine the direction they will be taking in 2007. Kevin said to be watching for a big announcement November 1st.
_________________
am i the only person who realized mad daddy said on november 6th to look for an announcement on november 1st? what is up with that?